A 22-panel solar install in Mount Maunganui.

James Electrical crew carrying a solar panel along the roofline, Valley Road, Mount Maunganui

Location

Valley Road, Mount Maunganui

Panels

22

Inverter

6kW hybrid

Battery

Ready, not fitted

On site

4 to 5 days

The brief

This homeowner wanted a cost-effective way to knock her power bill down, with the option to add a battery later. A few friends had solar, but she wasn’t sure what it would do for her place in Mount Maunganui. So we started with her power bill, modelled what a system on this roof would actually return, and only then designed it: 22 panels on a 6kW hybrid inverter, installed in four to five days.

The scope

01

Design and sizing

Every solar job starts the same way: a chat about how the house uses power through the day and night, then the power bill, then the numbers. We ran her bill through our modelling software so she could see the return before committing. 22 panels on a 6kW inverter is right in the sweet spot for this roof. There was little room to add panels later, so there was no point paying for inverter capacity the array could never use.

02

Roof array

22 panels on the roof, laid out for the sun the roof actually gets. Start to finish, the array went up in around four to five days on site. The drone shots below show the finished install from above, and how little of the roof is left over.

03

Inverter and switchboard

A 6kW hybrid inverter, deliberately not oversized. An oversized inverter runs inefficiently at the loads a house like this actually pulls, and the hybrid makes adding battery storage later a simple job rather than a rebuild. Grid-connected solar also needs the lines company on board, so the connection is applied for before switch-on, and like every job we do the install closes with a Certificate of Compliance.

04

Commissioning and handover

Once the connection was approved we switched the system on and set her up on the monitoring app, so she can see what the panels are making, what the house is using and what is going back to the grid. We don’t stop there. We check in as she uses the system and refine the settings so it keeps doing what the modelling said it would.

James Electrical crew installing the 22-panel solar array on a Mount Maunganui roof
Wiring the 6kW hybrid inverter beside the switchboard
Wiring the 6kW hybrid inverter beside the switchboard
Aerial view of the finished 22-panel solar array on a Mount Maunganui home
Aerial view of the finished 22-panel solar array on a Mount Maunganui home
Top-down drone view of the black solar panels on the white roof
Top-down drone view of the black solar panels on the white roof
The install from above, array facing north
The install from above, array facing north
Looking toward Mauao from above the Valley Road install
Looking toward Mauao from above the Valley Road install

Questions people ask about solar at the Mount

01

How much does a 22-panel solar system cost in Mount Maunganui?

It depends on the panels, the inverter and the roof, so we don’t quote from a price list. We quote from your power bill and your roof, which means the price reflects a system sized for your house rather than a package. Send us a recent bill and we will model what a system would return before you spend anything.

02

Will a 6kW inverter run a house?

For this house, yes, and that is the point of modelling first. The inverter is sized to what the house draws and what the array can make, not to the biggest number on the brochure. Oversizing costs more and runs less efficiently. If your loads are bigger, the modelling will show it and we size up.

03

Can we add a battery later?

Yes. The hybrid inverter at Valley Road is battery-ready, so storage can be added without replacing the inverter or rebuilding the board. EECA’s guidance is that batteries suit homes with high evening use or anyone wanting backup in an outage, and that starting without one keeps the upfront cost down while you see what solar alone does to your bill.

Planning solar at the Mount?

Send us a recent power bill and we’ll model what a system would return before you spend anything.